A building permit is required for all new major construction activities, including residential, industrial, and commercial projects.
Building Applications and Forms
Some building permit applications below are accompanied by a checklist and information guide that can be of assistance while completing the application form. Applications must be completed in full and signed by the property owner or their agent.
The time required to process a permit application is based on quality and completeness, degree of compliance with the Ontario Building Code. Processing an application and timing is regulated by the Building Code Act. If the application is not complete, it will delay the permit approval process. If an application is deemed complete, the Building Department has a maximum of 10 business days to issue a permit. Our office will contact you when your permit is completed.
All permit fees are due at the time you receive your permit.
If you have any questions about a building or septic/sewage system application or form please contact the Building Department.
Submitting a Complete Application
Complete applications must be submitted to the Building Department at the Main Administrative Office, 6544 New Dublin Road.
Complete applications can be submitted:
- In-person during business hours to the Main Office at:
6544 New Dublin Rd, Addison, ON, K0E 1A0 (Monday to Friday, 8:30am - 4:00pm); - By email to building@ektwp.ca or;
- By mail to 6544 New Dublin Rd, Addison, ON, K0E 1A0
You can also complete an online building or sewage system application through our Electronic Building Permit Application Portal using the button below.
Building Applications
New Construction and Major Projects
Accessory Buildings and Structures
Accessory buildings and structures over 108 square feet or storage buildings over 161 square feet require a building permit.
A building permit is required to construct a new attached deck or porch, regardless of size, or to repair or replace an existing deck or porch.
Additions and Minor Renovations
Additions and renovations can be major or minor projects depending on the scope of work proposed. A building permit is required for any addition to an existing building and for most renovations. If you are unsure whether your proposed renovation requires permit please contact the Building Department.
A demolition permit is required before any building, or part of a building, is removed or torn down. To request a reduced assessment value resulting in reduced property taxes during time structure(s) have been demolished, please complete Section 357 (form) in full.
- Demolition Application
- Section 357 Application (Section 357: Current year cancellation, reduction, refund of taxes due to property change ex. demolition, fire, etc.)
New or Expanding Farm Buildings and Structures
The construction of all farm buildings and structures requires a building permit.
For new or expanding livestock facilities for the purpose of housing livestock and manure, a Nutrient Management strategy or plan from the Ministry of Agriculture and Food may be required. All buildings and structures for the purpose of housing livestock and manure must also meet the minimum distance separation formula calculations (MDS II) as issued by the Ministry of Agriculture, Food and Agribusiness.
For new or expanding livestock facilities where MDS II is required, please contact the Planning Department for assistance.
Outdoor Solid Fuel Appliance/Woodstove/Fireplace
The Ontario Building Code regulates the installation of solid fuel burning appliances including masonry fireplaces, free-standing wood and pellet stoves and fireplace inserts. This includes any alteration to existing installations and replacements of part of or all of a system.
An outdoor solid fuel combustion appliance is a separate building that is used to heat a main dwelling. The typical wood-burning furnace is situated inside an out-building. To learn more about outdoor solid fuel appliance regulations please read the Outdoor Solid Fuel Combustion Appliances By-law 07-08.
Swimming pools (including soft-sided/inflatable pools) require a pool permit if the pool can hold over 18 inches (one and one half feet) of water. To learn more about swimming pool regulations and potential fencing requirements, please read Pool By-law 01-14.
If a deck is to be built in conjunction with the swimming pool, a separate building permit application for the deck is required.
Roof mounted solar panels with a face area equal to or greater than 5m2(53.8 ft2) require a building permit.
For any other construction projects not listed above, please fill out the general building permit application using the link below.
Depending on the type of construction, additional forms/documents may be required for a complete application. A list of building forms can be found on the Building Applications and Forms page below.
Fences do not require building permits at this time. Fences to enclose a pool must conform to the Pool By-law 01-14 as amended. If your property is a corner lot, contact the Planning Department as there may be setback requirements that a fence must comply with.
Please contact the Clerks Department for information on Line Fences and the Line Fences Act.
Septic/Sewage System Applications
Sewage System and/or Site Inspection application for new or replacement sewage system.
Commonly used for minor variance and zoning inspections, or prior to sale/purchase of a property with a sewage system.
Building and Septic/Sewage System Forms
Authorization for an application to be submitted by a person other than the legal owner.
To apply for an entrance permit for road/highways under municipal jurisdiction. Please note, if your property is located on a County Road, the United Counties of Leeds and Grenville is the approval authority for a new entrance.
Energy Efficiency Design Summary
This form is to be completed and signed by the person who reviews and takes responsibility for the energy efficiency design for the project.
Schedule 1 - Designer Information
This form is to indicate the individual who reviews and takes responsibility for design activities with respect to the project.
Schedule 2 – Sewage System Installer Information
This form is to indicate the individual responsible for the installation of the septic/sewage system.
Request for file search related to a Private Sewage Disposal System installed after 1973.
Pump-out Agreement-Owner’s Undertaking (These are required to be arranged to ensure a holding tank can get pump-out servicing).
Transfer of Sewage System to New Owner
This form is used when the owners name has been changed.
This form is to confirm location and casing depth of an existing well.
Information on wells is stores by the Ministry of Environment and Climate Change. You can access information through their website if your well information was submitted.
Backfill Notification and as Constructed
This form is used after a septic/sewage system permit has been issued for a new or replacement system and is to confirm that the sewage system components have been installed and completed as per the application supporting the permit.
This form is for the installer/contractor to certify that the Filter Medium for an installation of a Class 4 Sewage Disposal System conforms to the requirements of the Ont. Reg. 350/06 Section 8.7.5.3(3) under the Ontario Building Code Act.
This form is for the installer/contractor to certify that the stone for the installation of a Sewage Disposal System conforms to the requirements of Ont. Reg. 350/06 Section 8.7.3.3(5)(a) under the Ontario Building Code Act.
Sign up to our news and notices
Stay up to date on the Township's activities, events, programs and operations by subscribing to our news and notices.